construction update
-
30 October 2018
Fire hydrant reserve tank water inspection and test, planting Hokkaido cherry blossom and silver birch trees throughout the estate. Laying asphalt base throughout the entire road length and cut de sac. Electrical works of laying road heating elements half the road length and turning bay area.
9 photos -
23 October 2018
Earth works road construction of entrance turning bay area, road construction of middle part and cut de sac. Inclined surfacing works with grass turf throughout, green park form works ready for planting. Disassembling onsen drilling equipment as onsen water is found with a temperature of 57 degrees centegrade and a flow rate of 160 lites per minute.
9 photos