construction update

  • 6 November 2018

    Road works with laying road heating elements for the first half of the road and turning bay area, kerb, side walk and turning bay area paving works, laying protective asphalt on top of the road heating elements near lot 1, 2, 3, 5 and utility area.

    6 photos
  • 30 October 2018

    Fire hydrant reserve tank water inspection and test, planting Hokkaido cherry blossom and silver birch trees throughout the estate. Laying asphalt base throughout the entire road length and cut de sac. Electrical works of laying road heating elements half the road length and turning bay area.

    9 photos
  • 23 October 2018

    Earth works road construction of entrance turning bay area, road construction of middle part and cut de sac. Inclined surfacing works with grass turf throughout, green park form works ready for planting. Disassembling onsen drilling equipment as onsen water is found with a temperature of 57 degrees centegrade and a flow rate of 160 lites per minute.

    9 photos
  • 19 October 2018

    Turning bay road base construction, kerb laying and road base construction of the roundabout. Fire hydrant water supply valve installation. Tree marking for cutting and site inspection by Apex Property Limited.

    6 photos
  • 4 October 2018

    Drainage works with detention tank installation, road construction with cul de sac kerb base formwork, kerb/edge laying (exposed aggregate).

    6 photos
  • 28 September 2018

    Drainage works with detention tank installation, road construction with cul de sac kerb base formwork, kerb/edge laying (exposed aggregate).

    3 photos
  • 18 September 2018

    Electrical works construction of the substation footings, installation of the electrical substation unit, onsen and water supply pipe installation to all lots, road levelling and road base construction.

    6 photos
  • 11 September 2018

    Start of the road fire hydrant supply tank installation, installation of hand holes and electrical conduits and widening of the entry road.

    6 photos
  • 4 September 2018

    Installation of fire hydrant supply tank near the end of the road, concrete foundation slab for the start of the road, site meeting with RTA, handhole installed for electrical connections.

    6 photos
  • 21 August 2018

    Old disused road land filling, Inclined surface forming, end of the road excavating for the fire fighting water tank.

    6 photos
  • 17 August 2018

    Apex Property Limited site visitation and inspection, new road formation and excavation continues on site this week.

    6 photos
  • 31 July 2018

    Commencement of onsen drilling, excavation for road construction and storm water drainage works.

    3 photos
  • 24 July 2018

    Construction of rainwater drainage, starting earthworks with building the diversion embankment and further preparation of the onsen yard.

    6 photos
  • 16 July 2018

    Further disaster prevention works with building the sediment spill prevention fence and gabion cages. Site preparation for the onsen drilling.

    3 photos
  • 10 July 2018

    disaster prevention construction works continues and site preparation works for onsen drilling.

    11 photos
  • 27 June 2018

    Further tree,weed,root removal and disposal,
    construction begins for the sediment pond.

    9 photos
  • 19 June 2018

    Beginning of construction with trees,
    roots and weed removal.

    3 photos